Skip to main content

Posts

Showing posts with the label solar Gujarat policy

UPDATE ON SOLAR & WIND-SOLAR HYBRID POLICY & CLARITY OF SOLAR MW PROJECTS & ITS TARIFF

Solar Power Policy 2015 dtd 13.08.2015 (G.R. NO. SLR-11.2015-2442-B) Policy valid till 31.03.2020  Capacity: MW Scale (minimum I MW) and KW Scale (minimum I KW) Capacity installation: 50% of contracted demand / sanctioned load  End Use of Electricity: Captive consumption / sales to obligated entities / Third Party sale  Solar Projects under REC mechanism with sale of power to Distribution Licensees  Electricity duty exempted  Concession 50% Cross Subsidy Surcharge & Additional Surcharge for Third Party Sale  Concession of 50% of wheeling charges and losses  Amendment dated 26.09.2019 in Solar Power Policy 2015 (G.R. NO. SLR-11-2015-2442-BI) - For MSMEs Relaxation to MSMEs (Micro, S'nail & Medium Scale Enterprises) sector to install solar capacity (ground mounted or rooftop) without any limit irrespective of their sanctioned load  MSMEs allowed to set up Solar Projects under Net-Metering mode, ...

SOLAR PV ROOF TOP POWER PLANT PROJECT SUBSIDY SCHEME BY PGVCL FOR VADODARA GUJARAT - 600 MW

Lobel Solar Power System  Surya Gujarat 999 8931 555 LOBEL SOLAR POWER SYSTEM  LOBEL HOUSE 65 Mihir Park,  Opp. Mittal Apartment, Opp rajeev tower, Akota O.P.Road, Vadodara, Gujarat, India 390020 9327007852 - 9327007854